Road Construction Omv 630 Pdf

Product Details
Customization: Available
Certification: CE
Pressure: Medium Pressure
Manufacturer/Factory, Trading Company
Diamond Member Since 2018

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Type of Ownership
Limited Company
Plant Area
501~1000 square meters
  • Road Construction Omv 630 Pdf
  • Road Construction Omv 630 Pdf
  • Road Construction Omv 630 Pdf
  • Road Construction Omv 630 Pdf
  • Road Construction Omv 630 Pdf
Find Similar Products

Basic Info.

Model NO.
omv 630
Work Temperature
High Temperature
Voltage
0
Installation
Horizontal
Material
Alloy Steel
Warranty
12months
Delivery
10-15 Working Days
Transport Package
Carton Packing, and Finally with Pallet or Wooden
Specification
omv 630
Trademark
HANJIU
Origin
China
HS Code
8412291000
Production Capacity
500, 000 Sets Per Year

Product Description

road construction omv 630 pdf
 

Main Specification:

 

Type OMV 315 OMV 400 OMV 500 OMV 630 OMV 800 OMV 1000
Geometric displacement (cm3 /rev.) 333 419 518 666 801 990
Max. speed (rpm) cont. 510 500 400 320 250 200
int. 630 600 480 380 300 240
Max. torque (N·m) cont. 920 1180 1460 1660 1880 2015
int. 1110 1410 1760 1940 2110 2280
peak 1290 1640 2050 2210 2470 2400
Max. output (kW) cont. 38 47 47 40 33 28.6
int. 46 56 56 56 44 40
Max. pressure drop (MPa) cont. 20 20 20 18 16 14
int. 24 24 24 21 18 16
peak 28 28 28 24 21 18
Max. flow (L/min) cont. 160 200 200 200 200 200
int. 200 240 240 240 240 240
Weight (kg) 31.8 32.6 33.5 34.9 36.5 38.6
 


Road Construction Omv 630 PdfRoad Construction Omv 630 PdfRoad Construction Omv 630 PdfRoad Construction Omv 630 PdfRoad Construction Omv 630 PdfRoad Construction Omv 630 Pdf

 

APPLICATIONS:

  • Mobile equipment
  • Snow Removal, mowing
  • Spayer, trencher
  • Wood products
  • Material Handling Equipment
  • Oil & Gas
  • Forestry Equipment
  • Mining
here some tips before using a hydraulic orbital motors
 

Before starting, check the motor installation, whether the connection is correct and firm, and the system is correct.

Check whether the oil inlet and outlet directions and motor rotation direction meet the requirements of working conditions.

The pressure of the relief valve of the oil supply line is adjusted to the lowest value, and gradually adjusted to the required pressure after operation. Tighten the inlet and outlet pipes and the drain pipe.

 

After running the motor under no load for at least 10 minutes, gradually increase the pressure to the working pressure, and observe whether the motor is running normally at any time during the operation.

 

During operation, the working conditions of the motor and system should be checked frequently. If abnormal temperature rise, leakage, vibration and noise or abnormal pulsation of pressure are found, the machine should be stopped immediately to find out the cause.

 

Road Construction Omv 630 Pdf

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier
People who viewed this also viewed